Datadog Google Slides

Log every alert

When Datadog raises an alert, add a row with its details to Google Slides.

Try:

See all Datadog + Google Slides integrations or talk to a human

Trusted by teams already building on Knit·4.9 out of 5 stars4.9/5 on G2·GoogleGoogle for Startups Accelerator
prismforceHackerearthIsotopes AIInfojobsPayoneerOutsolveSkuadPayworksItiliteOnsurityRazorpayXMultiplierPeoplestrongScrutCeipal

How Knit builds this workflow

The Agent researches both APIs and wires the trigger on one side to the action on the other — no pre-built connector required. Here is the vocabulary it has to work with.

Datadog Explore Datadog →

Triggers
New alert

Fires when a monitor or check in Datadog raises an alert.

New or updated incident

Fires when an incident is opened or updated in Datadog.

Monitor state changed

Fires when a monitored site, service or alarm in Datadog changes state.

Actions
Create incident

Opens a new incident or alert in Datadog.

Acknowledge incident

Acknowledges an open incident in Datadog.

Resolve incident

Resolves an incident in Datadog.

Google Slides Explore Google Slides →

Triggers
New page created

Fires when a new page or doc is created in Google Slides.

Record added

Fires when a new record is added to a database or table in Google Slides.

Doc published

Fires when a doc in Google Slides is published or shared.

Status changed

Fires when a status field changes on a record in Google Slides.

Actions
Create page from template

Starts a new page in Google Slides from a saved template.

Add or update record

Creates or updates a record in Google Slides.

Append text

Adds text to the end of an existing doc in Google Slides.

Move page

Moves a page in Google Slides into a different space.

Start a post-incident review When an incident is resolved in Datadog, create a review document in Google Slides. See details
Track uptime check results When a monitor changes state in Datadog, record the change in Google Slides for monthly reporting. See details

See all Datadog + Google Slides integrations →  ·  Browse the full workflow library →

Enterprise-grade security

SOC 2 certified GDPR compliant ISO 27001 certified
Visit our Security Center Review the DPA
FAQ

Common questions

Can Knit build “Log every alert” between Datadog and Google Slides?

Yes — describe it in the box above and Knit's Integrations Agent researches Datadog and Google Slides's public API docs (or your own uploaded docs) and builds a working workflow, whether or not either app already has a pre-built connector.

How long does it take to build?

Minutes to a first working version, not weeks — you test it against real data before it goes anywhere near production.

Why log incidents to a spreadsheet or document?

A running log in Google Slides makes it easy to review incident counts, durations and causes over time without exporting data from Datadog.

Can I build a post-incident review automatically?

Yes. When an incident is resolved in Datadog, create a document or row in Google Slides with its timeline as the starting point for the review.

Put Integrations on Autopilot. Talk to Experts.

Knit is loved by customers across the globe due to our seamless product and white glove support. You'll love us too!

Talk to a Human